Repacking Hubs: Difference between revisions

From Bike Collectives Wiki
(Undo revision 8574 by Imywejyh (Talk))
mNo edit summary
Line 1: Line 1:
== Tools ==
<h1>[http://www.iscaffold.com.cn scaffolding]</h1>


[[Image:AxleTools.jpg|thumb|Cone Wrench and Combination Wrench]]
Architectural design will affect the cost?


* [[Bench Vice]]
Optimal design not only affects the one-time investment projects, but also affect the use phase of the recurrent costs, such as HVAC, lighting, energy consumption, maintenance fees,<b>[http://www.iscaffold.com.cn scaffolding]</b> one-time investment and recurrent costs of a certain inverse relationship, but by optimizing the design efforts to find the best combination of both, so that the entire project life cycle cost minimum.
* [[Axle Vice]]
* [[Cone Wrench]]
* [[Combination Wrench]]
* [[Grease]]
* [[Bearings]]
* [[Ruler]]
* Small [[Magnet]]


== Step 1: Wheel Removal ==
1. Design a direct impact on investment


# Remove the Wheel
Decision-making process, including project construction, project design and implementation of the three stages of the project. Control is the key to investment decision-making and design stage, and make investment decisions in the project, its key is design. According to statistics, the same functions to meet the conditions, technical and economic rational design, can reduce the construction cost of 5% to 10% or even up to 10% to 20%, such as a radio factory in the multi-storey frame structure factory (4 layer) designed as an independent unit based on the conventional design, due to the larger multi-plant load, resulting in a larger size independent of the monomer basic, depth deeper (-3.2m), after analysis by other designers such as the use of strip foundation under column can save a lot of concrete, and reduces the depth of excavation to reduce, compared to investing savings of more than 20 million; a two functions, structure, size, form the basis of comprehensive building are similar, including an in consideration of the legislation side effect of many decorative columns set and decorative lines, resulting in the part of the cost difference of 10 million, turns out to be described by a line, investment spending thousands of interference.
# Remove the Nuts or the Skewer


== Step 2: Using the vice ==
2. Indirect effects of investment in design quality


[[Image:SetupAxleVice1.jpg|thumb|Place the Axle Vice in the Bench Vice]]
According to statistics, the quality of the works of many causes of the accident, the design responsibility for the majority of 40.1%, ranking first. Many construction products due to the lack of optimal design, and feature set appears unreasonable, affect the normal use;
[[Image:SetupAxleVice2.jpg|thumb|Place the Axle Vice in the Bench Vice]]
[[Image:ExplodedAxle.jpg|thumb|Axle parts from left to right: Axle, Cone, Lock Washer, Lock Nut]]
[[Image:CleanHub.jpg|thumb|Clean out the old grease, check for pits.]]
[[Image:GreaseHub.jpg|thumb|Put new [[grease]] in]]
[[Image:InsertBearings.jpg|thumb|Insert new [[bearings]]]]
[[Image:ReplaceDustCap.jpg|thumb|Replace the dust caps]]


# Place the Axle Vice in the Bench Vice
Jan. 10 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!
# Find appropriate cone wrenches for both cone and lock nut.
# On a rear wheel break lose cone from lock nut on non-drive side. On a front wheel do which ever side.
# Remove lock nut any washers or spacers and then cone nut. Keep parts in the order they where removed.
# Slide axle out of hub.
# Remove dustcaps if they will come out easily if not leave them in.
# Remove bearings, [[magnets]] work great for this. Save on a clean rag.
# Clean cups cones and bearings. This may require the aid of some degreaser if grease is old and hard.
 
[[Category:How-to]]

Revision as of 14:13, 10 January 2011

scaffolding

Architectural design will affect the cost?

Optimal design not only affects the one-time investment projects, but also affect the use phase of the recurrent costs, such as HVAC, lighting, energy consumption, maintenance fees,scaffolding one-time investment and recurrent costs of a certain inverse relationship, but by optimizing the design efforts to find the best combination of both, so that the entire project life cycle cost minimum.

1. Design a direct impact on investment

Decision-making process, including project construction, project design and implementation of the three stages of the project. Control is the key to investment decision-making and design stage, and make investment decisions in the project, its key is design. According to statistics, the same functions to meet the conditions, technical and economic rational design, can reduce the construction cost of 5% to 10% or even up to 10% to 20%, such as a radio factory in the multi-storey frame structure factory (4 layer) designed as an independent unit based on the conventional design, due to the larger multi-plant load, resulting in a larger size independent of the monomer basic, depth deeper (-3.2m), after analysis by other designers such as the use of strip foundation under column can save a lot of concrete, and reduces the depth of excavation to reduce, compared to investing savings of more than 20 million; a two functions, structure, size, form the basis of comprehensive building are similar, including an in consideration of the legislation side effect of many decorative columns set and decorative lines, resulting in the part of the cost difference of 10 million, turns out to be described by a line, investment spending thousands of interference.

2. Indirect effects of investment in design quality

According to statistics, the quality of the works of many causes of the accident, the design responsibility for the majority of 40.1%, ranking first. Many construction products due to the lack of optimal design, and feature set appears unreasonable, affect the normal use;

Jan. 10 more knowledge of scaffolding and aluminum beam description, please visit this site and the scaffolding bbs to the website: http://www.iscaffold.com.cn 24 hour customer service phone!